⚙️ Phase 2 Playbook — Foundation & Scaffolding
描述
*Phase 2 is complete when the skeleton application is running, the CI/CD pipeline is operational, and the Evidence Collector has verified all foundation elements with screenshots.*
文档内容
# ⚙️ Phase 2 Playbook — Foundation & Scaffolding
> **Duration**: 3-5 days | **Agents**: 6 | **Gate Keepers**: DevOps Automator + Evidence Collector
---
## Objective
Build the technical and operational foundation that all subsequent work depends on. Get the skeleton standing before adding muscle. After this phase, every developer has a working environment, a deployable pipeline, and a design system to build with.
## Pre-Conditions
- [ ] Phase 1 Quality Gate passed (Architecture Package approved)
- [ ] Phase 1 Handoff Package received
- [ ] All architecture documents finalized
## Agent Activation Sequence
### Workstream A: Infrastructure (Day 1-3, Parallel)
#### 🚀 DevOps Automator — CI/CD Pipeline + Infrastructure
```
Activate DevOps Automator for infrastructure setup on [PROJECT].
Input: Backend Architect system architecture + deployment requirements
Deliverables required:
1. CI/CD Pipeline (GitHub Actions / GitLab CI)
- Security scanning stage
- Automated testing stage
- Build and containerization stage
- Deployment stage (blue-green or canary)
- Automated rollback capability
2. Infrastructure as Code
- Environment provisioning (dev, staging, production)
- Container orchestration setup
- Network and security configuration
3. Environment Configuration
- Secrets management
- Environment variable management
- Multi-environment parity
Files to create:
- .github/workflows/ci-cd.yml (or equivalent)
- infrastructure/ (Terraform/CDK templates)
- docker-compose.yml
- Dockerfile(s)
Format: Working CI/CD pipeline with IaC templates
Timeline: 3 days
```
#### 🏗️ Infrastructure Maintainer — Cloud Infrastructure + Monitoring
```
Activate Infrastructure Maintainer for monitoring setup on [PROJECT].
Input: DevOps Automator infrastructure + Backend Architect architecture
Deliverables required:
1. Cloud Resource Provisioning
- Compute, storage, networking resources
- Auto-scaling configuration
- Load balancer setup
2. Monitoring Stack
- Application metrics (Prometheus/DataDog)
- Infrastructure metrics
- Custom dashboards (Grafana)
3. Logging and Alerting
- Centralized log aggregation
- Alert rules for critical thresholds
- On-call notification setup
4. Security Hardening
- Firewall rules
- SSL/TLS configuration
- Access control policies
Format: Infrastructure Readiness Report with dashboard access
Timeline: 3 days
```
#### ⚙️ Studio Operations — Process Setup
```
Activate Studio Operations for process setup on [PROJECT].
Input: Sprint Prioritizer plan + Project Shepherd coordination needs
Deliverables required:
1. Git Workflow
- Branch strategy (GitFlow / trunk-based)
- PR review process
- Merge policies
2. Communication Channels
- Team channels setup
- Notification routing
- Status update cadence
3. Documentation Templates
- PR template
- Issue template
- Decision log template
4. Collaboration Tools
- Project board setup
- Sprint tracking configuration
Format: Operations Playbook
Timeline: 2 days
```
### Workstream B: Application Foundation (Day 1-4, Parallel)
#### 🎨 Frontend Developer — Project Scaffolding + Component Library
```
Activate Frontend Developer for project scaffolding on [PROJECT].
Input: UX Architect CSS Design System + Brand Guardian identity
Deliverables required:
1. Project Scaffolding
- Framework setup (React/Vue/Angular per architecture)
- TypeScript configuration
- Build tooling (Vite/Webpack/Next.js)
- Testing framework (Jest/Vitest + Testing Library)
2. Design System Implementation
- CSS design tokens from UX Architect
- Base component library (Button, Input, Card, Layout)
- Theme system (light/dark/system toggle)
- Responsive utilities
3. Application Shell
- Routing setup
- Layout components (Header, Footer, Sidebar)
- Error boundary implementation
- Loading states
Files to create:
- src/ (application source)
- src/components/ (component library)
- src/styles/ (design tokens)
- src/layouts/ (layout components)
Format: Working application skeleton with component library
Timeline: 3 days
```
#### 🏗️ Backend Architect — Database + API Foundation
```
Activate Backend Architect for API foundation on [PROJECT].
Input: System Architecture Specification + Database Schema Design
Deliverables required:
1. Database Setup
- Schema deployment (migrations)
- Index creation
- Seed data for development
- Connection pooling configuration
2. API Scaffold
- Framework setup (Express/FastAPI/etc.)
- Route structure matching architecture
- Middleware stack (auth, validation, error handling, CORS)
- Health check endpoints
3. Authentication System
- Auth provider integration
- JWT/session management
- Role-based access control scaffold
4. Service Communication
- API versioning setup
- Request/response serialization
- Error response standardization
Files to create:
- api/ or server/ (backend source)
- migrations/ (database migrations)
- docs/api-spec.yaml (OpenAPI specification)
Format: Working API scaffold with database and auth
Timeline: 4 days
```
#### 🏛️ UX Architect — CSS System Implementation
```
Activate UX Architect for CSS system implementation on [PROJECT].
Input: Brand Guardian identity + own Phase 1 CSS Design System spec
Deliverables required:
1. Design Tokens Implementation
- CSS custom properties (colors, typography, spacing)
- Brand color palette with semantic naming
- Typography scale with responsive adjustments
2. Layout System
- Container system (responsive breakpoints)
- Grid patterns (2-col, 3-col, sidebar)
- Flexbox utilities
3. Theme System
- Light theme variables
- Dark theme variables
- System preference detection
- Theme toggle component
- Smooth transition between themes
Files to create/update:
- css/design-system.css (or equivalent in framework)
- css/layout.css
- css/components.css
- js/theme-manager.js
Format: Implemented CSS design system with theme toggle
Timeline: 2 days
```
## Verification Checkpoint (Day 4-5)
### Evidence Collector Verification
```
Activate Evidence Collector for Phase 2 foundation verification.
Verify the following with screenshot evidence:
1. CI/CD pipeline executes successfully (show pipeline logs)
2. Application skeleton loads in browser (desktop screenshot)
3. Application skeleton loads on mobile (mobile screenshot)
4. Theme toggle works (light + dark screenshots)
5. API health check responds (curl output)
6. Database is accessible (migration status)
7. Monitoring dashboards are active (dashboard screenshot)
8. Component library renders (component demo page)
Format: Evidence Package with screenshots
Verdict: PASS / FAIL with specific issues
```
## Quality Gate Checklist
| # | Criterion | Evidence Source | Status |
|---|-----------|----------------|--------|
| 1 | CI/CD pipeline builds, tests, and deploys | Pipeline execution logs | ☐ |
| 2 | Database schema deployed with all tables/indexes | Migration success output | ☐ |
| 3 | API scaffold responding on health check | curl response evidence | ☐ |
| 4 | Frontend skeleton renders in browser | Evidence Collector screenshots | ☐ |
| 5 | Monitoring dashboards showing metrics | Dashboard screenshots | ☐ |
| 6 | Design system tokens implemented | Component library demo | ☐ |
| 7 | Theme toggle functional (light/dark/system) | Before/after screenshots | ☐ |
| 8 | Git workflow and processes documented | Studio Operations playbook | ☐ |
## Gate Decision
**Dual sign-off required**: DevOps Automator (infrastructure) + Evidence Collector (visual)
- **PASS**: Working skeleton with full DevOps pipeline → Phase 3 activation
- **FAIL**: Specific infrastructure or application issues → Fix and re-verify
## Handoff to Phase 3
```markdown
## Phase 2 → Phase 3 Handoff Package
### For all Developer Agents:
- Working CI/CD pipeline (auto-deploys on merge)
- Design system tokens and component library
- API scaffold with auth and health checks
- Database with schema and seed data
- Git workflow and PR process
### For Evidence Collector (ongoing QA):
- Application URLs (dev, staging)
- Screenshot capture methodology
- Component library reference
- Brand guidelines for visual verification
### For Agents Orchestrator (Dev↔QA loop management):
- Sprint Prioritizer backlog (from Phase 1)
- Task list with acceptance criteria (from Phase 1)
- Agent assignment matrix (from NEXUS strategy)
- Quality thresholds for each task type
### Environment Access:
- Dev environment: [URL]
- Staging environment: [URL]
- Monitoring dashboard: [URL]
- CI/CD pipeline: [URL]
- API documentation: [URL]
```
---
*Phase 2 is complete when the skeleton application is running, the CI/CD pipeline is operational, and the Evidence Collector has verified all foundation elements with screenshots.*